Large loads
A handful of vehicles can use most of the connection at once.
Fleets · Buses
A bus depot has fewer vehicles than a van depot but each one is a big load on the same connection, and the first departures come early. The plan puts power where it is needed first.
A handful of vehicles can use most of the connection at once.
Departure windows are narrow, so the order in which buses charge decides whether they are ready.
Many grid tariffs bill the busiest quarter hour, and a few large loads set it quickly.
Power goes first to the vehicles that need it first, with priorities and driver requests in the plan.
The same energy is spread across the hours the buses are parked, so the depot does not set a new peak.
If a reading or a link is lost, charging carries on at a reduced limit until it comes back.
No specific vehicle or charger brand is needed. We connect through your charge point management system or by API, and use vehicle data where your fleet allows it. Ask us about your setup.
Priorities and driver requests are part of the plan, and it is recalculated every 15 minutes, so the change is picked up in the next plan.
Book a 30 minute call. Bring your fleet list and shift times and we go through them.